corn.jpg (12620 bytes) krlogo.GIF (1036 bytes)


Implement Light Kit
edge.jpg (5125 bytes)
Oil Caddy
edge.jpg (5125 bytes)
SHELF-MATE
edge.jpg (5125 bytes)
Combine Tool Boxes edge.jpg (5125 bytes)
ATV Tool Box edge.jpg (5125 bytes)
STS Combine Toolbox edge.jpg (5125 bytes)
Utility Tool Boxes edge.jpg (5125 bytes)
JD Work Center
edge.jpg (5125 bytes)
NH/CIH Work Center
edge.jpg (5125 bytes)
Breakaway Tractor Mirrors
edge.jpg (5125 bytes)
K&R Home Page

edge.jpg (5125 bytes)
The Work Center Communication Tray
The Work Center
Assembly Instructions

MODELS:
JNH-9512/NH: TM SERIES
JC-9510/CIH: MXM SERIES
JNH-9508/NH/CAT: GENESIS CABS

  • Remove plastic plugs or metal setscrews in the front right-hand corner post of the cab.
  • Mount 2" flat plate (A) with two metric or standard bolts & flatwashers.
  • Mount main receiver tube (B) to the flat mounting plate with 2-1/2" oblts and flatwashers and lock-nuts
  • Slide L-bracket (E) into receiver tube (B) using 5/16x3/8" thumb set-screw. Adjust & tighten. L-bracket will mount both long or short for your personal needs.
  • Slide monitor T-bar (F) on L-bracket (E), adjust and tighten by using 5/16x38" thumb set-screw. monitor T-bar will mount with long side either right or left handed for your personal needs.
  • To mount monitors, drill holes in T-bar as your equipment demands.

* PLEASE CHECK TO MAKE SURE ALL SET-SCREWS & LOCK-NUTS ARE TIGHT.


Implement Light Kit | PMI Oil Caddy | SHELF-MATE
NH Work CenterCombine Tool Boxes | STS Combine Tool Boxes
Breakaway Tractor Mirrors | K&R Home Page | JD Work Center


K & R Distributing, Inc. - 1404 W. Church Street
Marshalltown, Iowa 50158
Call Us Toll Free  1-800-383-3908
mcardvisa.gif (7993 bytes)
Developed & Hosted by:
madiblack.gif (2242 bytes)